  • Involve all stakeholder as earlier as possible, especially top management that make final decision
  • Invite front-end staff that perform daily operation too in addition to user representative since they know every details
  • Make sure different level and user group are covered
  • Meeting invitation should be sent as early as possible
  • If meeting not possible for all, consider sampling survey by questionnaire
  • Check with user existing problems, bugs, limitation, comment, concern and expectation
  • Check error log for hidden issue need to handle
  • Check complaint, feedback or report so far, could be through staff interview
  • On-site observation for particular unmentioned problem
  • Role playing of particular user from different group or level to check if anything missing
  • Perform focus group testing to see if any unaware behavioral preference needs to consider
  • Use email or phone call to double check minor details
  • Requirement of different user group may be contradicted and need to discuss
  • Prototyping such as mock screen is easier for communication
  • For large user group, let them to consolidate first to save time if tight schedule or extend time
  • Seek permission for voice recording in meeting for double check of details only
  • Consider to use AI technology to convert voice to text during meeting if allowed
  • Write down requirement in details and send to user for double validation and confirmation
  • Set deadline for requirement collection and remind user earlier
  • Unless fatal or critical that affect normal system functioning, no additional requirement should be added that could delay project schedule seriously, handle at other phases or even project
  • Requirement after deadline may consider back during implementation especially if critical
  • Be responsive to user requirement if within scope, time and only minor effort is involved
  • Explain to user excessive requirement could delay whole project
  • Request schedule extension from user side if necessary for extra work
  • Consider to adjust scope by user so as to meet schedule
  • Prioritize requirement and record in requirement catalogue
  • Check maximum number of user function would be used concurrently in a period or at a time
  • Reconsideration by different angles and aspects to avoid missing items
  • Don’t make assumption but check with user
  • Global consideration across the project and all user team, and find the best arrangement
  • Ask developer or designer to participate if necessary to see if easy or not to implement
  • Is the requirement appropriate, worthwhile, and achievable? Are there other options?
  • Reject or provide counter proposal sometimes if necessary
  • Avoid instant messaging for formal communication
  • Understand existing practice rationale behind and see if able to change
  • Those desirable but not essential only implement when time is available
  • Check non-functional performance requirement such as loading speed and response time
  • Check priority, importance & dependency of requirements with reference to frequency of use
  • Never confirm requirement without fully understanding
  • Numbering requirement to facilitate communication
  • Turn on amendment tracking function for word and excel
  • Avoid requirement document overwritten after passing through many users
  • Compile clean version document after confirmation each round if involve many users
  • List out requirement but not implementation details otherwise endless
  • Jargon and special operation require explanation
  • Check related operation involving external system or other parties
  • Identify staff involved in all process and flow to avoid missing verification or approval
  • Check if process flow can be simplified, improved, more logical, or can remove unnecessary one
  • Make sure requirement of different scenario or navigation path are considered
  • Add back correct measures for extreme or special case, e.g., further amendment after approval
  • Check if need to provide better feedback, help, hint or assistance especially for new staff, e.g. code
  • After requirement collected, data, functional and business model would be created and documented in different specification for program development
  • Avoid complaint between different users but focus on finding solution to issue
  • Check with user on requirement using paper prototype or mockup screen that visualize the design and show all clickable elements, operation, basic program flow and the navigation path
  • Unclear, misleading and contradicting requirement could lead to incorrect implementation and the change afterwards could delay the projects
  • Use diagram to facilitate understanding & communication of work flow, e.g. process thread
  • Collect peak, average, concurrent, minimum & maximum usage for size estimation
  • Understand requirement better by trial on existing system
  • Employ deep dive techniques such as brain storm or 5 whys (keep asking) to find out root cause
  • Provide alternative proposal on some requirement to see if able to simplify implementation
  • Double check and confirm by development and user team to make sure no missing
  • Consult, discuss & confirm with users before written down to minimize amendment later on
  • Limit scope to must have features, principles & guidelines but not too much implement details
  • Check government standard, departmental guideline or legal obligation
  • Check system documentation and handbook of business operation or rules
  • Top management should voice out if any special request or concern but not till the end
  • Different methods and tools to collect requirement proposed by different parties could also be used